Ripping ground
In relation to civil engineering, the term ‘ripping’ refers to the loosening of soil, rock or frozen ground by drawing a forked or pronged implement through it.
Ripping (or deep ripping / deep tillage) is also used in agriculture to break up ground for crop planting.
Ripping can be carried out by tractors with rear-mounted rippers or by simple ripper or ‘blade’ attachments for excavators that can provide an alternative to hydraulic breakers.
A 'subsoiler' is similar to a ripper but often with wings on the foot of the tines to increase soil heave and shatter. Ref The HS2 London-West Midlands Environmental Statement, Glossary of terms and list of abbreviations, DETR 2013.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Minimum energy efficiency standards (MEES)
CIAT briefing on response to consultations for privately rented non-domestic properties.
Connect, collaborate, shape the future
Registration now live for UK Construction Week Birmingham.
CIOB announces Saul Humphrey FCIOB as new President for 26/27 term.
A quick, simple, and zero-bills solution to prevent overheating.
The adaptive reuse of large industrial structures.
Promoting the circular economy by extending the life of buildings.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.

















